- Cancellation Notice, Memo No.2279 as on 19.10.21
- "Construction of Raozan 400 MW ± 10% Combined Cycle Power Plant Project, Chattogram ( 2nd Re-Tender), BPDB, Bangladesh".
- Construction of Raozan 400 MW ± 10% Combined Cycle Power Plant Project, Chattogram(Re-Tender), BPDB, Bangladesh.
-
Invitation for Bids (IFB), IFB NO.787/2021 as on 02.02.2021.
-
International Tender Notice for Airfilter, Memo No.474 as on 06-01-2021.
- Tender Document for Procurement of Gas Turbine (Ansaldo GT 26 Previously known as Alstom GT-26) Air Intake Filter for Ghorasal 3rd Unit, Re-powered CCPP, BPDB, Palash, Narsingdi, Bangladesh
-
International Tender Notice, Memo No.288 as on 05-12-2020.
-
Tender document for Procurement of Air Intake Filters of Gas Turbine for Ghorashal 4th Unit Re-powered CCPP, BPDB, Palash, Narsingdi, Bangladesh.
- Syedpur 150 MW Gas Turbine Power Station (New-2020).
- Titas 50 MW Peaking Power Plant, BPDB(New_2020)
- Procurement for gas turbine of Ghorashal 365 MW CCPP.
- Invitation for Bids (IFB), IFB NO.801 as on 03.06.2020.
- Pre-Qualification
- 830 MW Projects
- Tender for new IPP
- Tender for new IPP at Bhairab 50 MW Project
- Tender for new IPP at Satkhira 50 MW Project
- Tender for new IPP at Ashugonj 50 MW Project
- Tender for new IPP at Ghorashal 100 MW Project
- Tender for new IPP at Fenchugonj 100-150 MW Project
- Tender for new IPP at Keranigonj 150 MW Project
- Tender for Coal Fired Power Project IPP
- Tender for IPP at Kaliakoir100-150 MW Project
- Tender for BPDB-RPCL 150 MW Power Plant Project
- Tender for Bibiyana 300-450 MW Gas Based Combined Cycle Power Plant Project
- Tender for Bhola 150-225 MW Gas Fired Combined Cycle Power Project
- Tender for Bhola 225 MW +/- 15% Combined Cycle Power Plant Project Public Sector
- Tender for Sikalbaha 225 MW +/- 10% Combined Cycle(Dual Fuel) Power Plant Project
- Sikalbaha 225 MW +/- 10% Combined Cycle(Dual Fuel) Power Plant Project(New Content_2020)
- Tender for Chapainawabganj 100 MW +/- 10% Power Plant (HFO Fired) Project
- Tender for shahjibazar 300 MW +/- 20% Gas Based CC Power Plant Project.
- Tender for Ghorasal 300-450 MW Gas Based CC Power Plant Project.
- Tender for Extension of Barapukuria Coal Fired Thermal Power Station by 250 MW +/- 10%(3rd Unit)
- Re-Tender for Implementaion of Dhaka 100-300 MW Coal Fired Power Plant Projects on BOO Basis.
- Re-Tender for Implementation of Dhaka 600-800 MW Coal Fired Power Plants Projects on BOO Basis.
- Re-Tender for Implementation of Chittagong 100-300 MW Coal Fired Power Plant Projects on BOO Basis.
- Re-Tender for Implementation of Chittagong 600-800 MW Coal Fired Power Plant Projects on BOO Basis.
- Re-Tender for Implementation of Barishal 100-300 MW Coal Fired Power Plant Projects on BOO Basis.
- RE-TENDERING OF RE-POWERING PROJECT OF GHORASAL 3RD UNIT
- RE-POWERING PROJECT OF GHORASAL 3RD UNIT.
- PURCHASING 250 MW POWER FROM INDIA.
- RE-TENDER FOR IMPLEMENTATION OF A 200-850 MW LNG-BASED POWER PROJECT ON BOO BASIS AT CHITTAGONG, BANGLADESH.
- TENDER FOR IMPLEMENTATION OF A 3 MWp GRID TIED SOLAR POWER PROJECT ON A BUILD,OWN AND OPERATE(BOO) BASIS AT SARISHABARI,JAMALPUR.
- TENDER FOR SELECTION OF THE PROJECT SPONSOR FROM THE NON-RESIDENT BANGLADESHI BIDDERS FOR IMPLEMENTATION OF A 50+/- 10% MW GAS FIRED POWER PROJECT ON A BOO BASIS AT FENCHUGANJ, BANGLADESH.
- TENDER FOR SELECTION OF THE PROJECT SPONSOR FOR IMPLEMENTATION OF A 65-85 MW DUAL FUEL (NAPHTHA/GAS) FIRED COMBINED CYCLE POWER PROJECT ON A BUILD, OWN AND OPERATE (BOO) BASIS AT CHITTAGONG, BANGLADESH.
- Conversion of Sylhet 150 MW Gas Turbine Power Plant to 225 MW Combined Cycle Power Plant Project
- Project for BIBIYANA-III 400MW Gas Based Combined Cycle Power Plant.
- Tender for Implementation of Dhorola 30MWp Solar Park on Build, Own and Operate (BOO) Basis at Dhorola River Side, KURIGRAM, BANGLADESH
- Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project
- Rendering Consultancy Services for Power Plant Projects at Maheshkhali Upazila in Cox's bazar District of Bangladesh.
- Notice for Request for Expression of Interest (EOI) for Technical Assistance to the Bangladesh Power Energy Efficiency Project Implementation Consultant.
- Construction of Bibiyana South 400±10% MW Gas Based Combined Cycle Power Plant Project
- Repowering Project of Ghorashal Unit-6
- Invitation for Expression of Interest (EOI) for Consulting services for Design and Supervision of Matarbari Ultra Super Critical Coal-Fired Power Project
- Construction of Moheshkhali 2x600-700 MW Coal Fired Ultra Super Critical Thermal Power Plant Project On Turn Key Basis.
- Procurement of Design, Supply and Install of 7.4 MWp (equal or higher) Solar photovoltaic(PV) Grid connected Power Generation plant at Kaptai on Turn key Basis.
- Tender for Installation of an Off-grid Wind-Solar Hybrid system with HFO/Diesel Based Engine Driven Generator in Hatiya Island Project.
- Repowering Project of Ghorashal 4th unit
- Solar Street Lighting Program in City Corporations of Bangladesh.
- Purchase of 250MW Power from Indian Sponsor on Short Term and Long Term Basis.
- Consturction of Khulna 200-300 MW Combined Cycle(Dual Fuel) Power Plant.
- Power Distribution System Development Project, Rajshahi Zone.
- Bangladesh India Freindship Power Company(Pvt.) Limited NOTICES
- Construction of Shahjibazar 100 MW Gas Turbine Power Plant Project.
- Purchase of 500MW Power from Indian Sponsor on Short Term and Long Term Basis.
- IMPLEMENTATION OF HFO FIRED POWER PROJECTS HAVING 1000±15% MW CAPACITY IN AGGREGATE EACH OF 100±15% MW CAPACITY ON A BUILD, OWN AND OPERATE (BOO) BASIS AT TEN (10) SITES IN BANGLADESH
- Procurement of Design, Supply and Install of 7.4 MWp (equal or higher) Solar photovoltaic(PV) Grid connected Power Generation plant at Kaptai on Turn key Basis as on August,2016.
- Design, Supply, Construction, Testing and Commissioning of 1MW+/-10% Grid Connected Power Plant Based on Municipal Solid Waste under Pilot Project at Keraniganj on Turnkey Basis.
- Procurement of Plant Design, Supply, Install and Commission for Conversion of 100MW Baghabari Gas Turbine Power Plant to 150MW Combined Cycle Power Plant and Conversion of 2*35MW Shahjibazar gas Turbine Power Plant to 105MW Combined Cycle Power Plant on Turn key basis.
- Khulna 330MW Dual fuel Combined Cycle Project.
-
Re-Tender Project for Design, Supply, Construction, Testing & Commissioning of Municipal Solid Waste to 1 ± 10% MW Energy Conversion Pilot Project at Keraniganj on Turnkey Basis as on 31.10.2017.
- Syedpur 150 MW ± 10% Simple Cycle (HSD based) Power Plant Project.
- Rendering Consultancy Service for IEE & EIA for (A) Saidpur 150±10% MW Power Plant Project (B) Shahjibazar 100 MW Gas Turbine Power Plant Project (C) Raojan 500-600 MW Power Plant Project, BPDB
- Construction of Raozan 600 MW ± 10% Combined Cycle Power Plant Project, Chattogram, Bangladesh.
- REOI Resettlement at Rampal.
- IPP for Solar Power Project
- IPP for Wind Power Project
- Re-Tender for 5 MW ± 20% Grid Connected Waste to Power Project on Build, Own And Operate (BOO) Basis at Jalkuri, Narayanganj, Bangladesh.